Lowering Our Impact on the Planet
Statistics show that only 31% of construction projects stay within 10% of the estimated budget, often due to unexpected site conditions.

This leads to increased costs and environmental impact due to overuse of materials like concrete and steel.

That's not how we work.
Why?
"Unexpected Site Conditions"
Better Scoping, Lower Drilling Cost
The y axis is how much more was spent on construction than expected. The x axis is how much the contract set aside budget for site investigation.

What is shown is that setting aside close to 0% of budget towards site investigations consistently leads to a run-up in construction costs above the set budget.

Not a good look, aye?
THIS IS WHERE ATROX COMES IN
ATROX provides you the tools to expect the unexpected.
INDUSTRY CULTURE
BEFORE ATROX
MINIMAL SAMPLING
Expertly Engineered
FOUNDATION OVERENGINEERED
Avoid High Costs and Poor Environmental Outcomes
INCREASE IN CONCRETE & STEEL
LABOUR, COSTS & EMISSIONS RISE
DIDN’T STICK TO BUDGET
INDUSTRY CULTURE AFTER ATROX
COMPREHENSIVE SAMPLING
Comprehensive Sampling, Environmentally Friendly
FOUNDATION BUILT TO SPEC
Environmentally Friendly Drilling Solutions
SAVES CONCRETE & STEEL
SAVES LABOUR, COSTS & EMISSIONS
DELIVERED ON BUDGET
Our rig is the diagnostics tool you need to save you hassle in the long run.
The ATX Series is designed to be as cost effective as possible, so you can make the upfront investment with ease.